In March 2013 Global-MSI completed the installation of two canopies for Shell. The site is located near a small town called Niesułków at the Service Station by A2 motorway. The delivery consist of main and HGV canopy.
The construction of the main canopy is a “square” 5-island arrangement with main deck and link. The HGV canopy is a 5-island startergate arrangement, with single passage between pump islands. Both canopies are designed in a double-skin technology. Delivery of the canopy involved canopy structure, complete roof system together with drainage and low profiled corrugated underlining sheets.
The installation of these two canopies was done according to our innovative “on a ground assembly”. This system of work can eliminate a work at height and effectively reduce the installation time.
For further information please contact Global-MSI on telephone number +48 12 641 67 02 or by email poczta@global-msi.pl