Shell Niesiułków, motorway A2, Poland

In March 2013 Global-MSI completed the installation of two canopies for Shell. The site is located near a small town called Niesułków at the Service Station by A2 motorway. The delivery consist of main and HGV canopy.

The construction of the main canopy is a “square” 5-island arrangement with main deck and link. The HGV canopy is a 5-island startergate arrangement, with single passage between pump islands. Both canopies are designed in a double-skin technology. Delivery of the canopy involved canopy structure, complete roof system together with drainage and low profiled corrugated underlining sheets.

The installation of these two canopies was done according to our innovative “on a ground assembly”. This system of work can eliminate a work at height and effectively reduce the installation time.

For further information please contact Global-MSI on telephone number +48 12 641 67 02 or by email poczta@global-msi.pl

Similar Posts

  • Circle K Vinstra, Norway

    In September 2017 Global-MSI has supplied two new canopies on the petrol station of Circle K company in Vinstra, in Norway. The scope of work consists of design, delivery and installation of new canopies, a 4-island startergate main and 3-island HGV one. Canopies were designed in a double-skin technology. Delivery of the canopies involved a…

  • Lotos Elbląg, Warszawska street, Poland

    In October 2014 Global-MSI completed the installation of the another canopy for oil company Lotos Paliwa in Elbląg. The construction of the canopy is a 2-island startergate arrangement, designed in a double-skin technology. Installation of the canopy involved canopy structure, complete roof system together with drainage, underlining and MH lights  with wiring, including connection for Lotos…

  • OKQ8 Ronneby, Sweden

    In February 2018 Global-MSI has supplied a canopy for new petrol station of OKQ8 oil company in Ronneby, in Sweden. It’s a typical OKQ8 automatic stations canopy with a 2-island startergate layout and an appearance of airplane wing. Itwas designed in a double-skin technology. Delivery of the canopy involved canopy structure, complete roof system together…