IGS, Keflavik International Airport, Iceland

The new building of the total area of 2500 sqm has been designed as an extension of the line of the existing ones, which serve as headquarters, warehouse and technical space for IGS company.

The scope of work consists of design, delivery & installation of main and secondary steel structure, internal mezzanine floor, which together with the surrounding building structure was additionally protected by fire pain to achieve a capacity of R60. External cladding consists a sandwich set of composite panel and corrugated sheets to obtain required thermal insulation and echo free radar surface. Build up roof with PVC membrane, including heated gullies and emergency smoke hatches. We have supplied also the external doors and window with all periphery flashings and internal fire walls from the mineral wool core composite panels.

For further information please contact Global-MSI on telephone number +48 12 641 67 02 or by email poczta@global-msi.pl

Similar Posts

  • Costco, Kauptún, Garðabær, Iceland

    First Costco canopy on Iceland! In February 2017 Global-MSI has supplied a first new canopy on Costco’s first Icelandic petrol station, which is located next to their supermarket in Kauptún, Garðabær. The construction of the canopy is a 5-island startergate type arrangement with a double columns arrangement. Canopy was, designed in a double-skin technology. Installation…

  • Slovnaft Štrba, Slovakia

    In May 2014 Global-MSI completed the installation of the another canopy for Slovnaft. The construction of the canopy is a 4-island startergate arrangement with a link connecting the canopy with the sales building, designed in a double-skin technology. Installation of the canopy involved canopy structure, complete roof system together with drainage, underlining and LED lights…

  • Circle K Vinstra, Norway

    In September 2017 Global-MSI has supplied two new canopies on the petrol station of Circle K company in Vinstra, in Norway. The scope of work consists of design, delivery and installation of new canopies, a 4-island startergate main and 3-island HGV one. Canopies were designed in a double-skin technology. Delivery of the canopies involved a…

  • IGS, Keflavik International Airport, Iceland

    In the middle of November, 2017 Global-MSI has constructed two Mezzanine Floors in existing Service Building for Icelandair Ground Services on Keflavik International Airport on Iceland. These Mezzanine Floors of total area about 430 sqm has been designed as portal frame structure. It will be use for periodical wings maintenance service of Icelandair airplanes. The…