OKQ8 Trollhatan, Kardanvägen, Sweden

In December 2013 Global-MSI completed another canopy installation for oil company OKQ8.  The canopy is a 2-island starter-gate arrangement designed with a double-skin. Installation of the canopy included the steel structure, a complete roof system with drainage, individually made aluminium underlining panels, flat and elliptical fascias on the edges of the canopy, wiring and lights, and OKQ8 branded signage.

For further information please contact Global-MSI on telephone number 48 12 641 67 02 or by email  poczta@global-msi.pl

Similar Posts

  • MOL Szigetszentmiklós, Hungary

    In September 2017 Global-MSI has supplied a new MOL’s canopy in Szigetszentmiklós in Hungary. The scope of work consists of design & delivery of new canopy, a 2-island startergate arrangement with a link between a shop. Canopy was designed in a double-skin technology. Delivery of the canopy involved canopy structure, complete roof system together with…

  • IGS, Keflavik International Airport, Iceland

    At the end of August 2018 Global-MSI has supplied and installed another Mezzanine Floor in existing Service Building for Icelandair Ground Services on Keflavik International Airport on Iceland. This Mezzanine Floor of total area about 700 sqm has been designed as portal frame structure. It will be used for periodical maintenance service of Icelandair airplanes….

  • Circle K Ulricehamn, Sweden

    In Ovtober 2017 Global-MSI has supplied a new canopy on the petrol station of Circle K company in Ulricehamn, in Sweden. The scope of work consists of design & delivery of new canopy, a 4-island startergate arrangement. Canopy was, designed in a double-skin technology. Delivery of the canopy involved canopy structure, complete roof system together…

  • Total Conakry, Kerouane, Guinea

    Another Global-MSI canopy has arrived to Guinea! In December 2017 Global-MSI has shipped a new canopy to Conakry in Guinea to be installed on Total Petrol Station. That was a Total MINI type canopy, which covering just a pump island. It was designed in a single-skin technology. Delivery consist of canopy structure and complete roof…

  • Slovnaft Štrba, Slovakia

    In January 2014 Global-MSI completed the installation of it’s first turnkey shop building for Slovnaft.  The shop building was designed as a lightweight steel frame with composite wall panels and the roof covered with PVC membrane. All front and side glazing was made in aluminium system. Delivery included all mechanical and electrical services and equipment…