UNITI Expo Trade Fair 2014
Visit us in Stuttgart!
Visit us in Stuttgart!
In October 2013 Global-MSI completed the installation of the another canopy for Shell. Canopy was designed according to the latest Shell’s site layout standard, which is called Speedgate and was developed to optimise forecourt traffic. Global-MSI has been involved from the beginning in the introduction of this scheme and we are proud to show you…
In January 2014 Global-MSI completed the installation of it’s first turnkey shop building for Slovnaft. The shop building was designed as a lightweight steel frame with composite wall panels and the roof covered with PVC membrane. All front and side glazing was made in aluminium system. Delivery included all mechanical and electrical services and equipment…
In December 2013 Global-MSI completed another canopy installation for oil company OKQ8. The canopy is a 2-island starter-gate arrangement designed with a double-skin. Installation of the canopy included the steel structure, a complete roof system with drainage, individually made aluminium underlining panels, flat and elliptical fascias on the edges of the canopy, wiring and lights,…
In January 2013 Global-MSI completed the installation of its first canopy for new client, MOL Oil. The canopy is a 2-island starter-gate arrangement with a link connecting the canopy with the sales building. Installation of the canopy included the steel structure, a complete roof system together with drainage, underlining and lights with wiring, and fixing…